Since year 2000 , new road construction technology methods have been   adopted in Kenya  for example benching.  
Benching is a method applied whenever one intend to extend the carriage width  of road section covered by gravel.
It
 involve digging on both edge of carriage   to a depth equal to depth of
 the existing  gravel which in  kenya standard road  of  cross section 
5.4 meters is 15 centimeters .The bench should be flat and length 
atleast equal to width of roller used for compaction.
Steps involved  are:
1.Setting Out:-This
 involve setting both the horizontal and vertical alignment of the 
road.This  is accomplished to getting centerline  of the road.From which
 the half carriage distance is obtained, the inslope and the length of 
the ditch.
2.Benching:The length of carriage to be extended is established and measured from the existing gravel.
3:Bench excavation:The bench equal  to extended width of carriage is excavate to a level equal to size of existing gravel.
4:Bench compaction:The bench is   then compacted to obtain the required moisture content of the soil.
5:Shuttering:The edge of carriage is covered with shutter of  (6  by  1 ).Gravel is then filled in between shutters and existing gravel edge
6:Gravel compaction:Gravel is compacted to a final depth of 120mm
 